# Schedule

The workshop runs from 9:00 AM to 5:00 PM with a morning break, lunch, and an afternoon break. Teaching time is five hours and fifty minutes.

| Time | Block | Length |
|---|---|---|
| 9:00 – 9:20 | [Welcome, environment check, and the Roastery tour](welcome/welcome.md) | 20 min |
| 9:20 – 10:30 | **Module 1** — [Fundamentals and the endpoint pipeline](module-1-fundamentals/concepts.md) | 70 min |
| 10:30 – 10:45 | Morning break | 15 min |
| 10:45 – 12:00 | **Module 2** — [Data, validation, and the shape of a good API](module-2-data/concepts.md) | 75 min |
| 12:00 – 1:00 | Lunch | 60 min |
| 1:00 – 2:15 | **Module 3** — [Identity, tokens, and authorization](module-3-security/concepts.md) | 75 min |
| 2:15 – 2:30 | Afternoon break | 15 min |
| 2:30 – 3:45 | **Module 4** — [Performance, resilience, and testing](module-4-production/concepts.md) | 75 min |
| 3:45 – 4:40 | **Module 5** — [Aspire, containers, and shipping](module-5-shipping/concepts.md) | 55 min |
| 4:40 – 5:00 | [Wrap-up, retrospective, and where to go next](wrap-up/review.md) | 20 min |

## Inside a module

Each module follows the same rhythm so you always know what is coming:

- **Concepts (about 25 minutes).** The instructor builds the feature live, explaining the decisions as they go. Follow along or just watch; the lab repeats everything at your own pace.
- **Lab (about 45 minutes).** You implement the feature in your own copy of Roastery, with a numbered set of steps, a stretch goal if you finish early, and a list of the mistakes people most often make.
- **Checkpoint.** Every lab ends at a git tag. If you are behind, run `git checkout checkpoint-N` and carry on with the group.

## If the day runs long

The schedule carries about fifteen minutes of slack, most of it in Module 5, which is designed to compress gracefully. If we need to cut, the cuts are made in this order: the versioning step in Lab 5, then the container build in Lab 5 (it becomes a demo), then the `HybridCache` step in Lab 4, then the security-header middleware in Lab 3. The integration tests in Lab 4 and the authorization policies in Lab 3 are never cut.
